Back to photostream

Pollegio - GBT Schutterstollen

This tunnel was used during the construction of the Gotthard Basistunnel for the removal of excavation material with a conveyor belt. It has a length of 3162 meters and leads to Loderio in the Blenio Valley. Switzerland, Oct 20, 2016.

2,011 views
1 fave
0 comments
Uploaded on October 26, 2016
Taken on October 20, 2016