Rossford Schools | Rossford Elementary School
Project Name: Rossford Elementary School
Owner: Rossford Schools
Architect: Collaborative - TMP
Construction Manager: Gilbane Building Company
Scope: Provide and Install Educational Casework
Completion: August 2019
A sleek design by Collaborative – TMP Architects, the new Rossford Elementary School features Stevens Industries plastic laminate casework throughout the building including architectural finishes and wall panels. The new building was completed in phases beginning with the renovation of the existing 14,000 sf space then the addition of the new 72,000 sf building.
Upon entering the building, a floor to ceiling corridor with plastic laminate panels was installed in the academic commons area. In addition to typical classroom and administrative casework, Rossford Elementary School features tiered bench seating with cushions and wall to wall shelving in the Knowledge Market. Stevens’ benches were installed throughout the hallways of the new building.
Stevens’ plastic laminate finishes include Fawn Cyrpress, Designer White, Fox, Mouse, Charcoal Velvet, and Storm with Grey Beola, Fawn Cypress, Nordic, and Designer White Surfaces. Hardware features 5-Knuckle Nickel hinges and Bar 128 Nickel pulls.