SR 169 Maple Valley Paving
Crews will remove or repair cracked concrete panels and repave 1.6 miles of State Route 169 between SE 264th Street and Witte Road in Maple Valley. The pavement on this section of SR 169 (Maple Valley/Black Diamond Road SE) is showing signs of deterioration and cracking. Removing damaged panels and repaving the roadway will end costly temporary repairs, provide drivers with a safer and smoother ride, and ensure that the roadway will last into the future.
10 photos · 430 views