SR 509 - Bridge Girder Removal

Nov. 21, 2009 – WSDOT contractor crews use two 250-ton cranes to remove eight enormous bridge girders from the State Route 509 bridge between Tacoma and Fife. Each massive 146-foot-long girder weighs as much as a blue whale.

 

Crews are repairing damage to the bridge sustained in a December 2002 rail-car fire. The blaze damaged two bridge columns and a total of 15 girders. To keep traffic moving, crews are repairing one half of the damaged span at a time, reducing a one-mile stretch of the four-lane bridge between Tacoma and Fife to two lanes with one lane of traffic in each direction.

Björn Granberg faved this
762 views
1 fave
0 comments
Taken on November 21, 2009
  • EF-S18-55mm f/3.5-5.6 IS
  • ƒ/9.0
  • 18.0 mm
  • 1/250
  • 100
  • Flash (off, did not fire)
  • Show EXIF
This photo is in 2 groups
This photo is in 1 album

Additional info

  • Viewing this photo Public
  • Safety level of this photo Safe
  • S Search
    Photo navigation
    < > Thumbnail navigation
    Z Zoom
    B Back to context