We are WPB > Collections

Throughout 2008, WPB was hard at work completing a Master Plan for the district. WPB hired Interface Studio as the lead contractor with Sam Schwartz (transportation) and Civic Economics (economic development) as sub-contractors on the project. The pictures included in this collection show the extensive community process that was included during the creation of the Master Plan, which was ultimately adopted in February 2009. (The master plan is available for download at wickerparkbucktownssa.org/?p=347.

Interface Studio: interface-studio.com/

Sam Schwartz: www.samschwartz.com/

Civic Economics: www.civiceconomics.com/