VaDOT > Collections

The project will realign the southbound and northbound I-95 off ramps to eliminate the existing yield condition. The signalized intersection at the interchange will be removed and replaced with a roundabout.

The proposed roundabout includes two lanes of circulation and a continuous bypass lane on the west bound approach. Both the northbound and southbound I-95 off-ramps are extended and improved to provide motorists greater distance and improved curvature for transition from the high speed mainline to the arterial. The northbound I-95 off-ramp is improved to provide for a free-flow movement and eliminate the existing yield controlled condition.