new icn messageflickr-free-ic3d pan white
Surfacing Lombard Street | by 21reasons
Back to photostream

Surfacing Lombard Street

On the 28th of July 2007 the Trailfairies descended on the Lombard Street section of Glentress's red route in order to repair a switchback corner that was showing signs of damage.

 

With drainage installed and the corner reshaped, Andy Wardman uses the wacker plate in order to produce a firm riding surface. Without this compaction the loose hardcore would quickly be eroded by rain and bike tyres.

330 views
0 faves
0 comments
Taken on July 28, 2007