new icn messageflickr-free-ic3d pan white
ESA/Amtrak Forces hand excavating for the installation of a pull box that will transition cable from trenching to the new Loop Central Instrumentation Hut (CIH) which will control the tracks, switches and signals along the Loop track used by Amtrak at the | by MTA C&D - EAST SIDE ACCESS
Back to photostream

ESA/Amtrak Forces hand excavating for the installation of a pull box that will transition cable from trenching to the new Loop Central Instrumentation Hut (CIH) which will control the tracks, switches and signals along the Loop track used by Amtrak at the

1,152 views
0 faves
0 comments
Uploaded on October 2, 2017