new icn messageflickr-free-ic3d pan white
ret_eos_img_0380_lic.jpg | by Mitch Waxman
Back to photostream

ret_eos_img_0380_lic.jpg

In the cold waste 2

 

Brownfield Work Site - photo by Mitch Waxman

 

9.5 acres, and owned by Rockrose Development (which has recently transformed itself into another corporate entity), this is the future home of four residential towers. As of April 2008, some 80,000 tons of contaminants had been removed from the site at a cost of $31 million. Standard Oil sited an oil refinery here in the 1860’s, and the soil is contaminated with Benzene, Petroleum Distillates, and volatile organic chemicals whose detected presence – in trace amounts- would cause the regular NYFD to evacuate and call in their HAZMAT teams.

 

Additionally, generations of untreated sewage and industrial pollution swirl and mix with the water table of the East River in the deeply cold gravels and blackened mud beneath the place. Sources also reveal that the “clean fill” being used to replace the contaminated substrates that were removed in the remediation process emanates from the tunnel being bored out from under the East River by the “East Side Access” project.

 

Who can guess, what it is, that still may lie hidden down there?

 

newtownpentacle.com/2009/12/30/in-the-cold-waste-2/

234 views
0 faves
0 comments
Taken on December 6, 2009