new icn messageflickr-free-ic3d pan white
Boston-Cambridge, Craigie Drawbridge, Nov 28, 2010 | by MassDOT
Back to album

Boston-Cambridge, Craigie Drawbridge, Nov 28, 2010

Work proceeds during Phase I of the Craigie Drawbridge Rehabilitation Project.

 

The Craigie Drawbridge carries McGrath O’Brien Highway (Route 28) between Land Blvd. in Cambridge and Leverett Circle in Boston. Visit the Craigie Drawbridge Rehabilitation project on the web for more information.

 

Bike and pedestrian access in each direction will be maintained during construction. As a result of the construction activities, the Charles River Channel will be closed to all marine traffic reopening no later than April 27, 2010.

1,178 views
3 faves
0 comments
Taken on November 28, 2010