Chengdu Trolleybus Overhead Map, 1983
The Chengdu trolleybus system was opened on 1962 January 1. It was closed 1996 January 10.
Chengdu started building a metro system in 2005. Today, there are two lines with a total system length of 49.7 km. Expansion to 291 km is planned by 2020.
Annual passenger traffic was 103 million at 2012.
6,082
views
2
faves
0
comments
Uploaded on May 24, 2012
Taken in March 1988
Chengdu Trolleybus Overhead Map, 1983
The Chengdu trolleybus system was opened on 1962 January 1. It was closed 1996 January 10.
Chengdu started building a metro system in 2005. Today, there are two lines with a total system length of 49.7 km. Expansion to 291 km is planned by 2020.
Annual passenger traffic was 103 million at 2012.
6,082
views
2
faves
0
comments
Uploaded on May 24, 2012
Taken in March 1988