Back to album

Chengdu Trolleybus Overhead Map, 1983

The Chengdu trolleybus system was opened on 1962 January 1. It was closed 1996 January 10.

 

Chengdu started building a metro system in 2005. Today, there are two lines with a total system length of 49.7 km. Expansion to 291 km is planned by 2020.

 

Annual passenger traffic was 103 million at 2012.

6,082 views
2 faves
0 comments
Uploaded on May 24, 2012
Taken in March 1988