Back to album

Lanzhou Trolleybus Overhead Map, 1983

The Lanzhou trolleybus system was opened on 1959 January 1. As "Yichen Jiang" notes, the system was closed, on 2008 May 6.

 

Construction of the first line of the Lanzhou Metro was started in 2012. The line, extending 26.8 km, was planned for completion in 2016. Expansion plans outlined a system of three urban and three suburban metro lines, with a total system length of 207 km.

 

The Lanzhou Metro opened on 2019 June 23. At 2022, Line 1 extended 25.9 km and served 20 stations.

3,620 views
5 faves
1 comment
Uploaded on May 22, 2012
Taken in March 1988