new icn messageflickr-free-ic3d pan white
Step 9 - install LED into location D1 with the longer lead of the LED into the square pad | by Low Voltage Labs
Back to photostream

Step 9 - install LED into location D1 with the longer lead of the LED into the square pad

lowvoltagelabs.com/products/pumpkin-kit/

172 views
0 faves
0 comments
Taken on July 25, 2013