new icn messageflickr-free-ic3d pan white
Poland Wolsztyn 2000 | by loose_grip_99
Back to photostream

Poland Wolsztyn 2000

Poland, scrapping of an ex-German 2-10-0 Kriegslok in progress in Wolsztyn yard. The boiler tubes (large superheater & small) are being systematically cut from the barrel. The large diameter pipe on top is (or should I say, was) the main internal steam pipe which takes the steam from the dome above to the wet side of the superheater header situated on the smokebox tubeplate (top left). The splay of narrow pipes beneath the boiler carried oil from the lubricator to the cylinders, axles, etc.

 

See where this picture was taken. [?]

7,699 views
6 faves
2 comments
Taken on March 20, 2000