Max checking out the base for the wind generator

The 9 metre mast will sit on this base.

 

We'll dig four other bases for the 8 metal guy ropes used to keep the mast absolutely straight.

 

The bolt goes through the bottom of the mast which will be pulled upright gently by our tractor and secured in place.

 

We still have a lot of building work to do before we put the generator up but the cement bases should be dry and completely solid by then.