flickr-free-ic3d pan white

Beijing Capital International Airport Terminal 3

Construction of Terminal 3 started on March 28, 2004 and was opened on February 29, 2008, becoming fully operational on March 26, 2008. Far grander in size and scale than the existing terminals, it is the largest airport terminal building complex built in a single phase with 986,000 sq. meters in total floor area. It features a main passenger terminal (Terminal 3C), two satellite concourses (Terminal 3D and Terminal 3E) and five floors above ground and two underground. (Wikipedia)


3xp HDR

8 faves
Taken on April 12, 2008