Wang Zhi, Assistant Production Manager of Jiamusi Zhongheng Thermoelectric Ltd. The power plant was put into operation in 1999, when it had only two steam turbines with an annual generating capacity 300 million degrees and could provide 1.75 million GJ annually for Dalkia with an annual coal consumption of 350,000 tons.

 