new icn messageflickr-free-ic3d pan white
Crushed limestone | by Alan  Gage
Back to photostream

Crushed limestone

Had them bring 2" the first load. It was bigger than I thought it would be and was very hard to move around with foot or shovel in the trench. I used 1" for the second load and it was much nicer to work with.

356 views
0 faves
2 comments
Taken on April 28, 2011