new icn messageflickr-free-ic3d pan white
Spans 9 & 10 Surface Prep and Paint | by MassDOT
Back to photostream

Spans 9 & 10 Surface Prep and Paint

On the Cambridge side looking towards Boston, Spans 9 and 10 of the Longfellow Bridge are prepped for painting. Also in view are the downstream “Salt and Pepper” towers, which are being dismantled and repaired.

 

3,978 views
2 faves
0 comments
Taken on July 16, 2015