Franklin Construction Interior work (3-24-16)
Crews are hard at work on the inside of Franklin. It is getting hard to recognize the old spaces. The auditorium and old cafeteria space is being transformed as crews cut through the flooring of both to expose the basement. The front entrance is undergoing its remodeling now and new sheerwalls are being built in the basement level that will extend up several floors for seismic strengthening.
10 photos · 101 views