Oct12-Sweaters

The orange one is almost done, the green one has 2 sleeves. In theory these are both for next weekend. What could possibly go wrong with this plan? ;)

andigal01 faved this
  • austen g. 3y

    That's two sweaters right there, far as I'm concerned.
  • Glenna C 3y

    austen g. Very true - one of them is just still 60% in the form of yarn. ;)
  • austen g. 3y

    If anyone can do it (and not set it on fire...) it's you. I've got faith!
  • Glenna C 3y

    austen g. You are the wind beneath my wiiiiiiiings.
    But actually it's not so bad so far (touch wood). I blocked the pieces of the orange one last night, so now it needs seaming, button band and collar.
    The green one (which is a pullover, so no button bands) has 2 sleeves and a back piece almost to the waist, and I've got 6 days. Go go gadget sweater knitting!
397 views
1 fave
4 comments
Taken on October 12, 2012
  • AF-S Nikkor 50mm f/1.8G
  • ƒ/2.8
  • 50.0 mm
  • 1/25
  • 250
  • Flash (off, did not fire)
  • Show EXIF

Additional info

  • Viewing this photo Public
  • Safety level of this photo Safe
  • S Search
    Photo navigation
    < > Thumbnail navigation
    Z Zoom
    B Back to context