Water Projects, Lesotho

Water Projects, Lesotho. Advance Infrastructure of the Metolong Dam and Water Supply Programme included bridges (two) and a tarred access road of 32km road to the site from Maseru. Also power supply, water and sanitation, telecommunications, construction camp and permanent operational facilities. Bridge 1 over the Phuthiatsana River at Ha-Makhoathi. There is also small scale agriculture next to the river some of which is irrigated, Lesotho farmers however rely more on rainfall than irrigation. Photo: John Hogg / World Bank

 

Photo ID: JH-LS-090625-2 World Bank

11,671 views
7 faves
0 comments
Taken on June 26, 2009
  • ƒ/11.0
  • 46.0 mm
  • 1/125
  • 100
  • Flash (off, did not fire)
  • Show EXIF
This photo is in 1 group
This photo is in 6 albums

Additional info

  • Viewing this photo Public
  • Safety level of this photo Safe
  • S Search
    Photo navigation
    < > Thumbnail navigation
    Z Zoom
    B Back to context