Maseru City

Water Projects,Lesotho. Advance Infrastructure of the Metolong Dam and Water Supply Programme included bridges (two) and a tarred access road of 32km road to the site from Maseru. Also power supply, water and sanitation, telecommunications, construction camp and permanent operational facilities. The water will be conveyed to Maseru for domestic and industrial use, mainly the textile industry whose water usage is high. The Central Business District (CBD) of Maseru, Kingsway. Photo: John Hogg / World Bank

 

Photo ID: Lesotho - Maseru City - John Hogg - 090626 (12)

haustin faved this
4,204 views
1 fave
0 comments
Taken on June 26, 2009
  • ƒ/11.0
  • 180.0 mm
  • 1/125
  • 100
  • Flash (off, did not fire)
  • Show EXIF
This photo is in 3 albums

Additional info

  • Viewing this photo Public
  • Safety level of this photo Safe
  • S Search
    Photo navigation
    < > Thumbnail navigation
    Z Zoom
    B Back to context