WSDOT · Sets
[?]

First two girders

We began replacing the General Mark W. Clark Memorial Bridge in 2009, between Stanwood and Camano Island, with a wider and safer bridge.

The new bridge will provide one lane in each direction and shared 14-foot shoulders to accommodate bicyclists and pedestrians and allow room for vehicle breakdowns.

The new bridge will meet stricter earthquake standards and require less maintenance. We will also construct a westbound left-turn pocket at Eide Road.

New pictures are added regularly and in the order they were taken (newest first). If you want to follow along with the bridge building, you may want to start from the oldest photos first and work your way forward.

Find out more about the project by visiting the project page: www.wsdot.wa.gov/Projects/SR532/Default. htm

Or

By signing up for our SR 532 e-mail updates: www.wsdot.wa.gov/EmailUpdates

How can I get more information?
Contact:
WSDOT Communications Dave Chesson
9025 El Capitan Way
Everett, WA 98208
Phone: 360-757-5970
E-mail: chessod@wsdot.wa.gov

85 photos, 2 videos | 3,579 views

items are from between 26 Aug 2009 & 22 Dec 2009.

Time-lapse photography: Installing second girder by WSDOT
Time-lapse photography: Installing first girder by WSDOT
First two girders by WSDOT
First two girders by WSDOT
First two girders by WSDOT
First two girders by WSDOT
First two girders installed by WSDOT
186-foot girder waits at the plant for delivery by WSDOT
186-foot girders by WSDOT
186-foot girders, ready and waiting by WSDOT
December at the bridge by WSDOT
December at the bridge by WSDOT
December at the bridge by WSDOT
December at the bridge by WSDOT
Releasing a column form by WSDOT
Crossbeam from west bank by WSDOT
Pier 3 Crossbeam reinforcing bar by WSDOT
West side columns ready for concrete by WSDOT
Pier 3 crossbeam reinforcing bar - 2 by WSDOT
Placing reinforcing bar - Pier 3 Crossbeam by WSDOT
Bridge girder installation Dec 21 by WSDOT
Bridge girder installation Dec 21 by WSDOT
Pouring South Columns by WSDOT
Pouring south columns by WSDOT
Excavating - West abutment by WSDOT
Pouring South Columns by WSDOT
Excavating - West abutment by WSDOT
Excavating - West abutment by WSDOT
Pouring South Columns by WSDOT
Pouring concrete for the bridge columns by WSDOT
Pouring bridge columns by WSDOT
SR 532 - Driving sheet piles by WSDOT
Stone column injector in action by WSDOT
Stone column injector by WSDOT
Stone column injector - stone hopper by WSDOT
Stone column injector by WSDOT
Pouring shafts - west end by WSDOT
The "clam" in action - west end by WSDOT
Setting column steel for a shaft by WSDOT
Steel Shoring - Adjacent to existing by WSDOT
Driving temporary piles - west work bridge by WSDOT
Driving temporary piles - west work bridge by WSDOT
View of bridge work by WSDOT
Drilling pier 3 - north shaft by WSDOT
Drilling & Driving.... by WSDOT
Drilling pier 3 - north shaft by WSDOT
Chaos or Poetry.... by WSDOT
Bundled 18-bar and hoop bar by WSDOT
Drilling pier 3 - north shaft by WSDOT
Drilling pier 3 - north shaft by WSDOT
Removing the temporary can section- during shaft pour by WSDOT
Removing a temporary can section- during shaft pour by WSDOT
Removing the temporary can section- during shaft pour by WSDOT
Removing the temporary can length(s) - during shaft pour by WSDOT
Measuring depth of concrete - during pour by WSDOT
Quality control - performing concrete tests by WSDOT
Shaft centralizer by WSDOT
Pier 3 shaft cage - east end by WSDOT
Pier 3 shaft cage - east end by WSDOT
Welding pier 3 shaft steel hoops by WSDOT

← prev 1 2
(87 in set)
Subscribe to a feed of stuff on this page... Feed – Subscribe to the set "SR 532 - Building the new General Mark Clark Bridge"