|
US 2 East of Stevens Pass
|
US 2 Downhill into Nason Creek
|
Shortly before 8 a.m. on
Thursday, Dec. 3, a Subaru
station wagon driven by a woman
left US 2 ...
  Some rights reserved
Uploaded on Dec 4, 2009
0 comments
|
Shortly before 8 a.m. on
Thursday, Dec. 3, a Subaru
station wagon driven by a woman
left US 2 ...
  Some rights reserved
Uploaded on Dec 4, 2009
1 note /
0 comments
|
|
US 2 Downhill into Nason Creek
|
US 2 Car Retrieval Close up
|
Shortly before 8 a.m. on
Thursday, Dec. 3, a Subaru
station wagon driven by a woman
left US 2 ...
  Some rights reserved
Uploaded on Dec 4, 2009
0 comments
|
Shortly before 8 a.m. on
Thursday, Dec. 3, a Subaru
station wagon driven by a woman
left US 2 ...
  Some rights reserved
Uploaded on Dec 4, 2009
0 comments
|
|
US 2 Car Retrieval in Perspective
|
Nile Valley Landslide - Dec. 2009
|
Shortly before 8 a.m. on
Thursday, Dec. 3, a Subaru
station wagon driven by a woman
left US 2 ...
  Some rights reserved
Uploaded on Dec 4, 2009
0 comments
|
A helicopter transports drilling
equipment to remote locations on
the landslide.
  Some rights reserved
Uploaded on Dec 3, 2009
0 comments
|
|
Nile Valley Landslide - Dec. 2009
|
Nile Valley Landslide - Dec. 2009
|
WSDOT crews stripe the new
roadway and the connection to SR
410.
  Some rights reserved
Uploaded on Dec 3, 2009
0 comments
|
Crews install guardrail along
the new, winter-durable detour.
  Some rights reserved
Uploaded on Dec 3, 2009
0 comments
|
|
Nile Valley Landslide - Dec. 2009
|
Nile Valley Landslide - Dec. 2009
|
The new, winter-durable, detour
through the Nile Valley.
  Some rights reserved
Uploaded on Dec 3, 2009
0 comments
|
WSDOT geotechnical engineers
continue to explore and study
the landslide.
  Some rights reserved
Uploaded on Dec 3, 2009
0 comments
|
|
Nile Valley Landslide - Dec. 2009
|
Nile Valley Landslide - Dec. 2009
|
Crews are hyrdoseeding the
landscape all along the new
river channel and road to
restore vegetation.
  Some rights reserved
Uploaded on Dec 3, 2009
0 comments
|
Bald eagle perched above the
Naches River.
  Some rights reserved
Uploaded on Dec 3, 2009
0 comments
|
|
Chetzemoka end section lift
|
Chetzemoka vehicle deck
|
No. 2 end section lift for
construction of the hull of the
64-car ferry Chetzemoka at Todd
Pacific ...
  Some rights reserved
Uploaded on Dec 3, 2009
0 comments
|
No. 2 end and vehicle deck of
the 64-car ferry Chetzemoka,
under construction at Todd
Pacific ...
  Some rights reserved
Uploaded on Dec 3, 2009
0 comments
|
|
Chetzemoka pilothouse
|
Chetzemoka pilothouse
|
Construction of the pilothouse
for the 64-car ferry Chetzemoka.
The pilothouse is being built ...
  Some rights reserved
Uploaded on Dec 3, 2009
0 comments
|
Construction of the pilothouse
for the 64-car ferry Chetzemoka.
The pilothouse is being built ...
  Some rights reserved
Uploaded on Dec 3, 2009
0 comments
|
|
Cargo Ship M.V. TOMAR
|
Bombardier's Flexity Streetcar being offloaded
|
Cargo Ship M.V. TOMAR docks at
Port of Tacoma to unload
Bombardier's FLEXITY Streetcar
  Some rights reserved
Uploaded on Dec 3, 2009
0 comments
|
Bombardier's FLEXITY Streetcar
offloading from the MV TOMAR at
the Port of Tacoma
  Some rights reserved
Uploaded on Dec 3, 2009
0 comments
|