Granite Seating at Cincinnati Riverfront Park

Granite Seating at Cincinnati Riverfront Park

Granite Seating is placed at the future site of Cincinnati Riverfront Park. The seating will surround the Walnut Street Event Lawn.

Anyone can see this photo All rights reserved

Uploaded on Feb 28, 2011

0 comments

Current @ The Banks

Current @ The Banks

Exterior work continues on the south building of Current @ The Banks. The crews are working on elevated platforms.

Anyone can see this photo All rights reserved

Uploaded on Feb 28, 2011

0 comments

Vine Street Wall Drilling

Vine Street Wall Drilling

Pile drilling began this week for the Vine Street Wall on the now closed section of Ted M. Berry Way at Rosa Parks Street.

Anyone can see this photo All rights reserved

Uploaded on Feb 28, 2011

0 comments

Freedom Way Decking

Freedom Way Decking

The Decking at Freedom Way is prepared for the concrete pour.

Anyone can see this photo All rights reserved

Uploaded on Feb 28, 2011

0 comments

Progress at Phase 2 Lot 2 Garage

Progress at Phase 2 Lot 2 Garage

Crews dig pile caps and form columns at the Phase 2 Lot 2 Garage site. View from Second Street.

Anyone can see this photo All rights reserved

Uploaded on Feb 28, 2011

0 comments

Scaffolding at Phase 2 Lot 2 Garage

Scaffolding at Phase 2 Lot 2 Garage

Crews continue building scaffolding and decking at the Phase 2 Lot 2 garage construction.

Anyone can see this photo All rights reserved

Uploaded on Feb 28, 2011

0 comments

Pavement Removal

Pavement Removal

A crew breaks up and hauls away existing street pavement on Joe Nuxall/Main Street in preparation for installation of a new road surface.

Anyone can see this photo All rights reserved

Uploaded on Feb 28, 2011

0 comments

Future Sidewalk Replacement

Future Sidewalk Replacement

On Second Street in front of the Phase 2 Lot 2 garage construction, a crew breaks up concrete to ready for the future sidewalk replacement.

Anyone can see this photo All rights reserved

Uploaded on Feb 28, 2011

0 comments

Joe Nuxhall Way

Joe Nuxhall Way

New pavement at Joe Nuxhall Way/Main Street covers the necessary and extensive underground utility work that was done.

Anyone can see this photo All rights reserved

Uploaded on Feb 28, 2011

0 comments

Freedom Way Scaffolding

Freedom Way Scaffolding

Scaffolding is prepared for the remaining section of Freedom Way decking.

Anyone can see this photo All rights reserved

Uploaded on Feb 28, 2011

0 comments

Phase 2 Garage 2

Phase 2 Garage 2

The access road at the Phase 2 garage site is getting shorter by the day as the lot fills with structure.

Anyone can see this photo All rights reserved

Uploaded on Feb 28, 2011

0 comments

Freedom Way Concrete Pour

Freedom Way Concrete Pour

Concrete is poured, at 2 a.m., for new Freedom Way.

Anyone can see this photo All rights reserved

Uploaded on Feb 28, 2011

0 comments

Joe Nuxhall Way Sidewalk

Joe Nuxhall Way Sidewalk

A crew completes the finish work on the newly poured sidewalk sections on the east side of Joe Nuxall Way/Main Street.

Anyone can see this photo All rights reserved

Uploaded on Feb 28, 2011

0 comments

Soil Recycling

Soil Recycling

The Ohio River sneaks up the bank while Parks crews prepare the riverbank site to...

Anyone can see this photo All rights reserved

Uploaded on Feb 28, 2011

0 comments

Holy Grail Bar and Grill

Holy Grail Bar and Grill

At the developer’s site the first retail tenant, the Holy Grail Bar and Grill, now has some storefront glass and block facade installed.

Anyone can see this photo All rights reserved

Uploaded on Feb 28, 2011

0 comments

Freedom Way Scaffolding 2

Freedom Way Scaffolding 2

Erecting of scaffolding for the last half of Freedom Way progresses.

Anyone can see this photo All rights reserved

Uploaded on Feb 28, 2011

0 comments

Concrete Pour

Concrete Pour

A truck on Second Street pours concrete from above to form columns.

Anyone can see this photo All rights reserved

Uploaded on Feb 28, 2011

0 comments

Re-bar Installation at Phase 2 Garage

Re-bar Installation at Phase 2 Garage

Crews install re-bar for the mid-level at the Phase 2 garage site, another foundation in the making for further private development.

Anyone can see this photo All rights reserved

Uploaded on Feb 28, 2011

0 comments

← prev 1 2 3 4 5 6 7 8 9 10 11
(200 items)
Subscribe to a feed of stuff on this page... Subscribe to The Banks Public Partnership's photostream – Latest | geoFeed | KML