|
BOW AND ANCHOR (November 30)
|
READY TO RUN (November 30)
|
Workers continue to paint the
ship’s bulbous bow with the
anchor on the ground below.
All rights reserved
Uploaded on Nov 30, 2009
0 comments
|
New fitness equipment is ready
to go in the Lotus Spa gym.
All rights reserved
Uploaded on Nov 30, 2009
0 comments
|
|
TOUCHING UP (November 29)
|
GETTING A LIFT (November 29)
|
Painters freshen up the paint on
the ship’s decorative walls.
All rights reserved
Uploaded on Nov 30, 2009
0 comments
|
Cranes hoist materials to and
from the upper decks.
All rights reserved
Uploaded on Nov 30, 2009
0 comments
|
|
CARPET ON THE PROMENADE DECK? (November 28)
|
THE HEART OF THE GAME (November 25)
|
The ship’s new carpet is laid
out on the Promenade Deck as it
is cut to the right size before
being ...
All rights reserved
Uploaded on Nov 30, 2009
0 comments
|
A casino staff member re-tools
the works inside one of the
slot machines to get it ready
for a new ...
All rights reserved
Uploaded on Nov 30, 2009
0 comments
|
|
CLEAR VIEW (November 25)
|
PROPELLER VIEW (November 25)
|
A worker seals a new window into
place.
All rights reserved
Uploaded on Nov 30, 2009
0 comments
|
The starboard propeller gets
some attention from workers.
All rights reserved
Uploaded on Nov 30, 2009
0 comments
|
|
FRESH NEW CARPET (November 25)
|
GYM FLOOR GETS A WORKOUT (November 25)
|
Workers roll out the new carpet
in the atrium, and cut it to the
perfect fit.
All rights reserved
Uploaded on Nov 30, 2009
0 comments
|
The Lotus Spa fitness center is
getting new equipment, but first
it gets a new floor surface.
All rights reserved
Uploaded on Nov 30, 2009
0 comments
|
|
STRIPPED DOWN (November 25)
|
CHECKING THE STABILIZER (November 25)
|
Dining room chairs are stripped
in preparation for re-staining.
All rights reserved
Uploaded on Nov 30, 2009
0 comments
|
The port side stabilizer fin is
covered while workers inspect
its housing in the hull.
All rights reserved
Uploaded on Nov 30, 2009
0 comments
|
|
ON THE WAY TO A NEW NAME (November 25)
|
NEW PAINT JOB (November 25)
|
Workers remove the “Tahitian”
name from the ship’s bow.
All rights reserved
Uploaded on Nov 30, 2009
0 comments
|
The bulbous bow gets a new coat
of primer paint.
All rights reserved
Uploaded on Nov 30, 2009
0 comments
|
|
BRING IN THE CABLES (November 24
|
SABATINI’S MAKEOVER (November 24)
|
New cables are installed in the
passenger stateroom hallway of
deck 8.
All rights reserved
Uploaded on Nov 30, 2009
0 comments
|
Work in Sabatini’s, one of the
ship’s specialty restaurants, is
underway
All rights reserved
Uploaded on Nov 30, 2009
0 comments
|
|
WORK POOL PARTY (November 24)
|
WORKOUTS TO RESUME SHORTLY (November 24)
|
It’s a work pool party on deck
as major repairs and
refurbishments are made to the
pool, spas and ...
All rights reserved
Uploaded on Nov 30, 2009
0 comments
|
Fresh carpet is installed in the
fitness center before new
exercise equipment is delivered.
All rights reserved
Uploaded on Nov 30, 2009
0 comments
|