You aren't signed in     Sign In    Help

Riv Set - CRAVE - 3

Riv Set - CRAVE - 3 by NateKlan.
The three week CRAVE series at Riv.

We pulled down the black fabric from our previous set build and replaced it with eighth inch hardboard and pegboard. The pegboard has 1 mil translucent plastic behind it and we drilled out holes so the backlights would make the letters CRAVE visible. All the LED lights that were pointed up were reoriented to point down and toward the back wall so that the holes in the pegboard would effectively glow with color.

The most involved part of this was attaching all the sheets of hardboard and pegboard. We went through almost two full boxes of screws. Given the option I would have used 3/16 inch thick materials but that would've cost nearly twice as much, which is crazy.

Message resources available here

Would you like to comment?

Sign up for a free account, or sign in (if you're already a member).

[?]
view photos Uploaded on June 10, 2009
by NateKlan

NateKlan's photostream

450
uploads

This photo also belongs to:

Riv Stage (Set)

49
items

Lansing Area (Set)

280
items

flickr creative elements design WAREHOUSE lab (Pool)

Tags

Click this icon to see all public photos and videos tagged with Set Set

Additional Information

All rights reserved Anyone can see this photo

Add to your map
Anyone will be able to see this on the map
 (edit)