|
En-suite mock-up IMG_2275
|
corridor services IMG_2279
|
this is our mock-up of an
en-suite shower-room in a
standard bedroom.
All rights reserved
Uploaded on Jul 5, 2009
0 comments
|
the structural kit is
fire-sealed and then the
services are installed...
certainly more costly, but ...
All rights reserved
Uploaded on Jul 5, 2009
0 comments
|
|
Secondary ceiling system IMG_2277
|
Secondary ceiling system for fire safety IMG_2276
|
our secondary ceiling system...
which gve the building such a
high fire containment rating.
All rights reserved
Uploaded on Jul 5, 2009
0 comments
|
one room with the grid ceiling
unfinished.... the other
completed
All rights reserved
Uploaded on Jul 5, 2009
0 comments
|
|
Sprinkler system being pressure tested IMG_2274
|
Front Entrance IMG_2273
|
pressure testig the
fire-suppression system (the one
piece of equipment you hope you
will never ...
All rights reserved
Uploaded on Jul 5, 2009
0 comments
|
the front entrance being
constructed
All rights reserved
Uploaded on Jul 5, 2009
0 comments
|
|
courtyard IMG_2272
|
12-05-09 The main carpark is being formed
|
the ramps being built in the
courtyard
All rights reserved
Uploaded on Jul 5, 2009
0 comments
|
the drive into the main carark
area... being levelled, ready
for the tarmac.
All rights reserved
Uploaded on May 20, 2009
0 comments
|
|
12-05-09 The Scaffolding is down
|
day185-c_13-01-09_GF_west_wing_corridor
|
Now that the scaffolding is
down... it looks like a proper
building...!
All rights reserved
Uploaded on May 20, 2009
0 comments
|
The west wing ground-floor
corridor ceiling being
fire-lined
All rights reserved
Uploaded on Jan 20, 2009
0 comments
|
|
day185-c_13-01-09_GF_centre_coridor_
|
The_Kit_day185-c_13-01-09
|
All rights reserved
Uploaded on Jan 18, 2009
1 comment
|
All rights reserved
Uploaded on Jan 18, 2009
1 comment
|
|
The_Kit_day170-c_09-12-08
|
The_Kit_day160-c_25-11-08
|
almost closed up to the
elements. The roof is half
tiled too!
All rights reserved
Uploaded on Dec 10, 2008
0 comments
|
All rights reserved
Uploaded on Nov 27, 2008
1 comment
|
|
The_Kit_day148-c_07-11-08
|
The_Kit_day148-3-c_07-11-08
|
just before the second flight of
stairs ar dropped in!
All rights reserved
Uploaded on Nov 19, 2008
0 comments
|
the roof is being tiled......
it's begining to look like a
proper building now.
All rights reserved
Uploaded on Nov 19, 2008
0 comments
|
|
The_Kit_day148-2-c_07-11-08
|
Proposed_room_-_Panoramic-c
|
a different view
All rights reserved
Uploaded on Nov 19, 2008
0 comments
|
a flavour of how some of the
rooms might look in the new
build
All rights reserved
Uploaded on Nov 19, 2008
0 comments
|