Feb. 17, 2012

Feb. 17, 2012

Checkerboard: the mold-resistant sheetrock is going up on the north side of the center.

Anyone can see this photo All rights reserved

Uploaded on Feb 17, 2012

0 comments

Feb. 17, 2012

Feb. 17, 2012

Pallets of bricks have arrived; they will be used for siding some exterior center walls.

Anyone can see this photo All rights reserved

Uploaded on Feb 17, 2012

0 comments

Feb. 17, 2012

Feb. 17, 2012

The view from Fisher Science.

Anyone can see this photo All rights reserved

Uploaded on Feb 17, 2012

0 comments

Feb. 17, 2012

Feb. 17, 2012

Note the thermal cooling tower at left: it's being covered with a neutral tan paint.

Anyone can see this photo All rights reserved

Uploaded on Feb 17, 2012

0 comments

Feb. 17, 2012

Feb. 17, 2012

Going Green: more of the center's south walls have mold-resistant sheetrock installed.

Anyone can see this photo All rights reserved

Uploaded on Feb 17, 2012

0 comments

Feb. 9, 2012

Feb. 9, 2012

Matching the drawing: The view at Via Carta and North Perimeter Drive is looking even more like architectural renderings.

Anyone can see this photo All rights reserved

Uploaded on Feb 17, 2012

0 comments

Feb. 9, 2012

Feb. 9, 2012

View from Dexter Lawn: The center is changing the campus core skyline.

Anyone can see this photo All rights reserved

Uploaded on Feb 17, 2012

0 comments

Feb. 9, 2012

Feb. 9, 2012

Pallets of building materials are delivered by crane to the roof -- five stories high at the east wing.

Anyone can see this photo All rights reserved

Uploaded on Feb 17, 2012

0 comments

Feb. 9, 2012

Feb. 9, 2012

Green growth: more mold-resistant sheetrock is up on the center's south side.

Anyone can see this photo All rights reserved

Uploaded on Feb 17, 2012

0 comments

Feb. 2, 2012

Feb. 2, 2012

The center goes checkerboard; the green panels are sheetrock specially treated to repel mold.

Anyone can see this photo All rights reserved

Uploaded on Feb 10, 2012

0 comments

May 11, 2011

May 11, 2011

The holes are dug for the center's foundation, and some poured with concrete.

Anyone can see this photo All rights reserved

Uploaded on Feb 10, 2012

0 comments

Feb. 3, 2012

Feb. 3, 2012

Student ambassadors and PolyReps pose with Dean Phil Bailey (third from left) on what will be the third floor's "green roof" full of plants.

Anyone can see this photo All rights reserved

Uploaded on Feb 8, 2012

0 comments

Feb. 3, 2012

Feb. 3, 2012

The green walls are expanding on the East Wing of the center.

Anyone can see this photo All rights reserved

Uploaded on Feb 8, 2012

0 comments

Feb. 3, 2012

Feb. 3, 2012

Sunset at the center.

Anyone can see this photo All rights reserved

Uploaded on Feb 8, 2012

0 comments

Feb. 3, 2012

Feb. 3, 2012

Sunset at the center.

Anyone can see this photo All rights reserved

Uploaded on Feb 8, 2012

0 comments

Feb. 3, 2012

Feb. 3, 2012

The sunset spotlights progress on the center's construction.

Anyone can see this photo All rights reserved

Uploaded on Feb 8, 2012

0 comments

Feb. 3, 2012

Feb. 3, 2012

The faculty & staff tours started in what will be the main entrance to the second floor. The...

Anyone can see this photo All rights reserved

Uploaded on Feb 8, 2012

0 comments

Feb. 3, 2012

Feb. 3, 2012

The stairwell from the second to sixth floors is topped by skylights.

Anyone can see this photo All rights reserved

Uploaded on Feb 8, 2012

0 comments