Jennifer on 120' Guyed Tower

Jennifer on 120' Guyed Tower

Jenny Climbing 120' to Inspect a Proven 6 KW off Grid system. This system supplies power to two homes in Custer, WI

Anyone can see this photo All rights reserved

Uploaded on Sep 10, 2009

0 comments

Brandon, Randall & Alan 120' SST

Brandon, Randall & Alan 120' SST

Brandon, Randall & Alan service a Jacobs 20Kw machine located in Custer, WI

Anyone can see this photo All rights reserved

Uploaded on Sep 10, 2009

0 comments

Randall Repairing Blade

Randall Repairing Blade

Randall uses epoxy to repair a damaged blade on a Jacobs 20 Kw system.

Anyone can see this photo All rights reserved

Uploaded on Sep 10, 2009

0 comments

Randall 120' vertical

Randall 120' vertical

Anyone can see this photo All rights reserved

Uploaded on Sep 10, 2009

0 comments

Alan Hands free

Alan Hands free

It took me 3 days on the tower to stop hanging on for dear life, But Look Mom I am finally hands free.

Anyone can see this photo All rights reserved

Uploaded on Sep 10, 2009

0 comments

Brandon

Brandon

Brandon taking pictures while waiting for groundman to send up tools.

Anyone can see this photo All rights reserved

Uploaded on Sep 10, 2009

0 comments

1940's Jacobs

1940's Jacobs

This Jacobs 1.5 kw is located at the MREA in Custer, WI and still producing power.

Anyone can see this photo All rights reserved

Uploaded on Apr 19, 2008

0 comments

Enertech Wind System

Enertech Wind System

This is an old 70s model Enertech wind system

Anyone can see this photo All rights reserved

Uploaded on Apr 19, 2008

0 comments

120' wind turbine blade

120' wind turbine blade

A pair of 120' commercial wind turbine blades are loaded on a trailer for delivery at...

Anyone can see this photo All rights reserved

Uploaded on Apr 19, 2008

1 comment

Small Blade vs large

Small Blade vs large

Tammy 5' 7" holds a set of 5' blades for a home size wind turbine, with a 120' commercial size blade in the background.

Anyone can see this photo All rights reserved

Uploaded on Apr 19, 2008

0 comments

Tower Hinge

Tower Hinge

All though this is a self support tower, two legs have hinges for crane to lift into the vertical position.

Anyone can see this photo All rights reserved

Uploaded on Jan 19, 2008

0 comments

Ready for Concrete

Ready for Concrete

The foundation is now ready for concrete to be poured.

Anyone can see this photo All rights reserved

Uploaded on Jan 19, 2008

0 comments

Rebar cages

Rebar cages

Rebar cages are set in foundation hole to be filled with concrete.

Anyone can see this photo All rights reserved

Uploaded on Jan 19, 2008

0 comments

Unassembled tower base

Unassembled tower base

Tower base is assembled.

Anyone can see this photo All rights reserved

Uploaded on Jan 19, 2008

0 comments

Foundation Hole

Foundation Hole

Hole is dug for the tower pier type foundation.

Anyone can see this photo All rights reserved

Uploaded on Jan 19, 2008

0 comments

Up She Goes

Up She Goes

The crane is hoisting the tower to stand up. This is a self support tower, but two of the legs are on hinges for tower erection only.

Anyone can see this photo All rights reserved

Uploaded on Jan 19, 2008

0 comments

Anemometer arms

Anemometer arms

The arms for the anemometers are being mounted on the tower while tower is still on the ground.

Anyone can see this photo All rights reserved

Uploaded on Jan 19, 2008

0 comments

Blade sliding on the shaft

Blade sliding on the shaft

The blade is being slide onto the shaft

Anyone can see this photo All rights reserved

Uploaded on Jan 19, 2008

0 comments

← prev 1 2 3 4 5 6 7 8 9 10 11
(200 items)
Subscribe to a feed of stuff on this page... Subscribe to Beaufort scale 5's photostream – Latest | geoFeed | KML