Jennifer on 120' Guyed Tower
|
Brandon, Randall & Alan 120' SST
|
Jenny Climbing 120' to Inspect a
Proven 6 KW off Grid system.
This system supplies power to
two ...
All rights reserved
Uploaded on Sep 10, 2009
0 comments
|
Brandon, Randall & Alan
service a Jacobs 20Kw machine
located in Custer, WI
All rights reserved
Uploaded on Sep 10, 2009
0 comments
|
|
Randall Repairing Blade
|
Randall 120' vertical
|
Randall uses epoxy to repair a
damaged blade on a Jacobs 20 Kw
system.
All rights reserved
Uploaded on Sep 10, 2009
0 comments
|
All rights reserved
Uploaded on Sep 10, 2009
0 comments
|
|
Alan Hands free
|
Brandon
|
It took me 3 days on the tower
to stop hanging on for dear
life, But Look Mom I am finally
hands ...
All rights reserved
Uploaded on Sep 10, 2009
0 comments
|
Brandon taking pictures while
waiting for groundman to send up
tools.
All rights reserved
Uploaded on Sep 10, 2009
0 comments
|
|
1940's Jacobs
|
Enertech Wind System
|
This Jacobs 1.5 kw is located at
the MREA in Custer, WI and still
producing power.
All rights reserved
Uploaded on Apr 19, 2008
0 comments
|
This is an old 70s model
Enertech wind system
All rights reserved
Uploaded on Apr 19, 2008
0 comments
|
|
120' wind turbine blade
|
Small Blade vs large
|
A pair of 120' commercial wind
turbine blades are loaded on a
trailer for delivery at the
Milwaukee ...
All rights reserved
Uploaded on Apr 19, 2008
1 comment
|
Tammy 5' 7" holds a set of
5' blades for a home size wind
turbine, with a 120' commercial
size ...
All rights reserved
Uploaded on Apr 19, 2008
0 comments
|
|
Tower Hinge
|
Ready for Concrete
|
All though this is a self
support tower, two legs have
hinges for crane to lift into
the vertical ...
All rights reserved
Uploaded on Jan 19, 2008
0 comments
|
The foundation is now ready for
concrete to be poured.
All rights reserved
Uploaded on Jan 19, 2008
0 comments
|
|
Rebar cages
|
Unassembled tower base
|
Rebar cages are set in
foundation hole to be filled
with concrete.
All rights reserved
Uploaded on Jan 19, 2008
0 comments
|
Tower base is assembled.
All rights reserved
Uploaded on Jan 19, 2008
0 comments
|
|
Foundation Hole
|
Up She Goes
|
Hole is dug for the tower pier
type foundation.
All rights reserved
Uploaded on Jan 19, 2008
0 comments
|
The crane is hoisting the tower
to stand up. This is a self
support tower, but two of the
legs are ...
All rights reserved
Uploaded on Jan 19, 2008
0 comments
|
|
Anemometer arms
|
Blade sliding on the shaft
|
The arms for the anemometers are
being mounted on the tower while
tower is still on the ground.
All rights reserved
Uploaded on Jan 19, 2008
0 comments
|
The blade is being slide onto
the shaft
All rights reserved
Uploaded on Jan 19, 2008
0 comments
|