The loads are first pulled up to the level of the dock, and backed out almost onto the dock. The engines then uncouple, and return to spot empty cars so that they can be loaded with pellets and fines that are in piles alongside the track. Finally, the engines recouple to the loaded cars and continue up the hill to the Cramer Tunnel.