Library Plan

Library Plan

It's amazingly satisfying to be finally able to have all my books in one room. Here's my current...

Anyone can see this photo Attribution Some rights reserved

Uploaded on Feb 6, 2012

0 comments

_DSC0155

_DSC0155

One of two or three feasts served by the client, at a building adjacent to the site. All pizza and...

Anyone can see this photo Attribution Some rights reserved

Uploaded on Sep 19, 2011

0 comments

_DSC0203

_DSC0203

The west wing of the main Bauhaus building, seen from my apartment. We used the studio on the right hand side.

Anyone can see this photo Attribution Some rights reserved

Uploaded on Sep 19, 2011

0 comments

_DSC0201

_DSC0201

The studio in use, late Thursday night before the review at the end of the first week.

Anyone can see this photo Attribution Some rights reserved

Uploaded on Sep 19, 2011

0 comments

_DSC0002

_DSC0002

The structure is loaded onto a truck.

Anyone can see this photo Attribution Some rights reserved

Uploaded on Sep 19, 2011

0 comments

_DSC0006_cropped

_DSC0006_cropped

The structure is loaded onto a truck.

Anyone can see this photo Attribution Some rights reserved

Uploaded on Sep 19, 2011

0 comments

_DSC0008

_DSC0008

While the structural work (foundations and frame) is being completed on site, other students work on the...

Anyone can see this photo Attribution Some rights reserved

Uploaded on Sep 19, 2011

0 comments

_DSC0012

_DSC0012

A preliminary cut - we left the final cut for later, to do on-site after testing the fit directly on the...

Anyone can see this photo Attribution Some rights reserved

Uploaded on Sep 19, 2011

0 comments

_DSC0016

_DSC0016

Friday of the second week: now the full team is on site.

Anyone can see this photo Attribution Some rights reserved

Uploaded on Sep 19, 2011

0 comments

_DSC0013

_DSC0013

The Tyvek membrane (donated) goes on, over an OSB skin suggested by the structural engineer.

Anyone can see this photo Attribution Some rights reserved

Uploaded on Sep 19, 2011

0 comments

_DSC0015

_DSC0015

The Tyvek membrane (donated) goes on, over an OSB skin suggested by the structural engineer.

Anyone can see this photo Attribution Some rights reserved

Uploaded on Sep 19, 2011

0 comments

_DSC0017

_DSC0017

The main window team, and the roofers.

Anyone can see this photo Attribution Some rights reserved

Uploaded on Sep 19, 2011

0 comments

_DSC0022

_DSC0022

Installing the main window.

Anyone can see this photo Attribution Some rights reserved

Uploaded on Sep 19, 2011

0 comments

_DSC0024

_DSC0024

Night is falling - the main window is the final element of the water-tight envelope.

Anyone can see this photo Attribution Some rights reserved

Uploaded on Sep 19, 2011

0 comments

_DSC0025

_DSC0025

Final installation of the plexi for the main window

Anyone can see this photo Attribution Some rights reserved

Uploaded on Sep 19, 2011

0 comments

_DSC0031

_DSC0031

The shelter at the end of the night on Friday.

Anyone can see this photo Attribution Some rights reserved

Uploaded on Sep 19, 2011

0 comments

_DSC0033

_DSC0033

Shelter! We have an enclosed envelope (ignoring the door).

Anyone can see this photo Attribution Some rights reserved

Uploaded on Sep 19, 2011

0 comments

_DSC0035

_DSC0035

Saturday morning - most of the students have had to fly home, but the German students, teaching...

Anyone can see this photo Attribution Some rights reserved

Uploaded on Sep 19, 2011

0 comments

← prev 1 2 3 4 5 6 7 ... 30 31
(562 items)
Subscribe to a feed of stuff on this page... Subscribe to gshowman's photostream – Latest | geoFeed | KML