Back to photostream

Carnegie Ave Crossover

The two local tracks split to form a third track in the middle. This format continues until the Fairwood Blvd switch. The empty high trestle is the planned right-of-way for the future Fulton St. Line.

40 views
0 faves
0 comments
Uploaded on May 27, 2014
Taken on May 27, 2014