Buckley kennel

Soffit is installed. About all we like to the out side is painting the door trim and putting on gutters.

We now are starting on the inside of building. It now is wired, AC is mounted and keeping the building a cool 72 degrees for now. We rwrapped the building with bubble wrap between the meatal. THe buble wrap has about a 6 of better R factor. We also put R-13 insulation in the ceiling and between the rafters. Now ready for the paneling.