Group Pool 157 items |   Only members can add to the pool. Join?

Discussion 0 posts |  Only members can post. Join?

No topics have been posted yet.


About Thameslink Programme

This scheme will tackle overcrowding on some of the UK’s busiest routes by increasing passenger capacity north-south to and through London. It will deliver clear and tangible benefits for passengers, the environment and the UK economy. The programme will deliver:-

50 per cent longer trains across the current Thameslink route
New direct services, to new destinations on the Thameslink route (e.g. Cambridge to Gatwick).
A reduction in overcrowding on the Underground, with three times as many trains travelling between St Pancras International and Blackfriars every hour (an increase from 8 to 24).
New stations and an end to bottlenecks at Blackfriars and London Bridge
New trains across the Thameslink route
A new connection to St Pancras International station (from December 2007)
Platform extensions to improve 50 stations outside of central London.

Click here for the latest news.

This group has been established to document the changing face of London, and outlying stations in direct relation to Network Rail's "flagship" project...The Thameslink Programme.
Please geotag your photos if you can!

http://www.thameslinkprogramme.co.uk/cms/pages/home

Additional Information

This group is public This is a public group.

  • Members can post 10 things to the pool each month.
  • Accepted media types:
    • Photos
    • Video
  • Accepted content types:
    • Photos / Videos
    • Screenshots / Screencasts
  • Accepted safety levels:
    • Safe
RSS 2.0 feed Subscribe to a feed of stuff on this page... Feed – Subscribe to Thameslink Programme discussion threads